Showing posts with label Lean value stream mapping. Show all posts
Showing posts with label Lean value stream mapping. Show all posts

Monday, July 13, 2020

Value Stream Map...

A value stream map is a lean technique used to document, analyze, and improve the flow of information or materials required to produce a product or service for a customer. 

> Identify and eliminate waste
> Review the flow of process steps and information from origin to delivery
> Has a system of symbols to depict various work activities and information flows

Value Stream Map extends on the Process Map

A process map is a work that should ideally happen as part of the process on the floor, whereas a value stream map is what actually happens
  • NVA - Non-value-added work - actions that should be eliminated. 
  • ENVA - Essential non-value-added work - wasteful actions but essential under operating procedures. 
  • VA - Value Added work - Actions that add value to the work. 
  1. Add time for each activity
  2. Calculate total time
  3. Calculate Total value-added time 
  4. VA / Total Time = Process cycle efficiency (PCE) 
How to create a VSM?

Example of Pizza Delivery 
  • Step 1: Identify the start and endpoints

  • Step 2: Document the process steps

Next, indicate how many operators complete each step in the circle within each box. 


Next, include a data box to indicate:

1. CT or the cycle time - Time to complete each activity
2. CO - Change Over Time The time to switch between steps
3. Up Time - The percentage of time the machine is up and running. 
4. Yield - Percentage of parts that pass inspection. 

Next, indicate cycle time (CT) (shown in the diagram below). 


  • Step 3: Add inventory and wait times. Connect the start and endpoints. Electronic flow lines represent customer call and electronic payment, a vertical-lined thick line is material pushed from one process to the other, and the solid thick line is shipment/delivery.

Use Inventory Triangles In between each phase to mark the number of parts in WIP. 
Add symbols at the shipment (scooter here) - to show method of shipment
  • Step 4: Draw information flow:
- Draw information flow: Suppliers, Production control to represent people centrally coordinating between the suppliers and the pizza store - ensure raw material stock at pizza store doesn't' go below minimum prescribed level. 

- Then place lines of communications (straight lines (manual comms) and crooked lines)

- Add notes about the type of exchange, frequency of exchange and the media used


  • Step 5: Create Timelines
- Finally create timelines at the bottom of the value stream map. The timelines will have three levels -- 

-- Value-added process
-- Essential non-value added process
-- Non-value added process


- Finally, add a databox at the bottom that houses - Total Cycle Time, Value Added Time and Process Cycle Efficiency


Another example of Value Stream Map (Call Centre)





If we already have automation, what's the need for Agents?

“Automation” and “agent” sound similar — but they solve very different classes of problems. Automation = Fixed Instruction → Fixed Outcome ...